首页 > 工程物探测绘 >  阴极防护/腐蚀控制 > 腐蚀控制产品 > 环氧树脂涂料 > HBE-95环氧树脂涂料
HBE-95环氧树脂涂料
HBE-95环氧树脂涂料
订货号: MM-80546-00
产地: 美国
品牌:
开发编号: N
市场价:
*此产品根据配置不同价格不同
*此价格为参考价格,具体价格以订单合同为准
    我在现场:
    产品视频:
  • 产品描述
  • 技术参数
  • 技术文档
  • 相关产品
  • 明细价格
  • 购买流程
产品描述:

Product Description
HBE-95 is a "state of the art" surface coating designed to solve specific industry problems by combining the unique features of epoxy and proprietary cure technologies.
HBE-95 is a 100% solids, two-component epoxy coating system which has been specifically designed as an exterior coating applied to bare steel for protection of pipe joint girth welds, valves and fittings, or as a touch-up material or rehabilitation system for mainline coatings.
Typical Uses
Protective coating for pipelines in buried or immersed applications. Used as a direct-to-metal corrosion and abrasion-resistant coating and as a rehab coating on steel pipelines and at girth welds. Also used as touch-up material for mainline coatings. Excellent coating for pipeline valves, fittings, and bends.
Features
High Build in a single coat.
Sets and cures over a broad temperature range
Environmentally safe.
100% solids, Zero V.O.C.
Excellent adhesion to grit blasted steel -- an ideal mainline corrosion coating for pipelines.
Superior adhesion to Fusion Bonded Epoxy (FBE) Coatings -- ideal coating for joint protection and repair of FBE coated pipe.
Excellent chemical & abrasion resistance.
Outstanding resistance to cathodic disbonding up to 95°C (203°F) operating temperature.
Easily applied with brush or roller.
About CANUSA-CPS
CANUSA-CPS-CPS is a leading manufacturer of specialty pipeline coatings which, for over 30 years, have been used for sealing and corrosion protection of pipeline joints and other substrates. CANUSA-CPS high performance products are manufactured to the highest quality standards and are available in a number of configurations to accommodate your specific project applications.
Technical Data
Coating Description
Epoxy
Conversion to Solids
100%
Theoretical Coverage
425 mil-sq. ft. / liter (1605 mil-sq. ft. / US gallon)
(1.0 mm-m2 / liter)
Typical Thickness
>20 mils
Flashpoint (T.C.C)
>95°C (203°F)
Mixing Ratio (by Volume)
3 Parts Base to 1 Part Hardener
Typical Product Properties
 
Coating
Property
Test
Standard
Unit
Typical
Values
Hardness
ASTM D2240
Shore D
> 85
Adhesion
     To Steel (Sp10 at 24 mils)
     To FBE
   
ASTM D4541
ASTM D4541
   
psi
psi
   
> 2000
> 2000
Cathodic Disbondment
     28 days @ 23°C
     28 days @ 80°C
     28 days @ 95°C
   
CSA Z245.20
CSA Z245.20
CSA Z245.20
   
mm, radius
mm, radius
mm, radius
   
< 3
< 8
< 8
Impact Resistance
     at -30°C
     at 25°C
  
CSA Z245.20
CSA Z245.20
   
Joules (in-lb)
Joules (in-lb)
   
> 3.0 (> 26.5)
> 3.0 (> 26.5)
Hot Water Immersion
     28 days at 75°C
     28 days at 95°C
  
CSA Z245.20
CSA Z245.20
   
1 to 5
1 to 5
   
1, excellent
1, excellent
Flexibility
ASTM D570
deg / pipe diam.
> 0.7
Water Absorption
ASTM D149
%
< 0.1
Dielectric Strength
ASTM D543
Volts / micron
(Volts / mil)
> 16
(> 400)
Chemical Resistance
ASTM D543
various solutions
excellent
Surface Preparation
Direct-to-steel
Remove all visible deposits of oil, grease and other contaminates by solvent washing in accordance with SSPC-SP1. Abrasive blast surfaces to a Near-White (SSPC-SP 10, NACE 2, SA2 1/2) or better, with a 2-4 mil blast profile.  
On cured pipe coating
Remove gloss on surface by light abrasive blasting or power tool. All surfaces to be coated must be completely dry, free of moisture, soil, dust and grit at the time the coating is applied. All weld splatter must be removed from the surface and rough welds must be ground smooth prior to coating.
Cleanup, Storage & Safety
Clean-up
For clean-up use xylene, MEK or mixture. 
Storage
Products must be shipped and stored at temperatures between 15°C (60°F) and 40°C (105°F). DO NOT FREEZE.
Safety
Material Safety Data Sheet and product labels contain detailed health, hygiene and safety information. This coating is intended for industrial use by properly trained professional applicators. Do not apply without adequate air exchange and ventilation in enclosed areas. Use fresh air respirator in confined areas. Wear protective clothing when spraying the coating. Breathing fumes or contact with skin can cause respiratory and other allergic reactions in some people. See MSDS for HBE-95-BG Base and MSDS for HBE-95-BG Cure.
Mixing & Application Instructions
For detailed application instructions please refer to HBE-95 Installation Guide.
Materials must be allowed to warm to at least 28°C (70°F) prior to mixing.
Pre-mix Base (more viscous component) slowly with a variable speed drill gun fitted with an appropriate mixing impeller.
Pour pre-measured Hardener into pre-measured Base.
At temperatures between 15°C (59°F) and 40°C (105°F). Mix for one (1) minute blend both parts to create one uniform color with no streaks. Begin mixing slowly. Caution: Mix at a speed that ensures a uniform mix, but does not create a vortex in the liquid. Slow mixer down at surface of the liquid to prevent introduction of air into the coating.
Pot-life is approximately 15 minutes at 20°C (70°F) and shortens with increased temperatures.
HBE-95 must be applied to clean dry surface only.
Ambient conditions for successful application include: relative humidity less than 85%; and the substrate temperature greater than 3°C (5°F) above the dew point.
The acceptable substrate temperature range for application of HBE-95 is 10°C (50°F) to 100°C (212°F). Applying onto warm substrate greater than 38°C (100°F) enhances coating adhesion.
Formulated to mixing ratio of 3 parts Base to 1 part Hardener by volume.
If additional coats are required, they shall be applied while the preceding coat is still tacky (no tie coat needed). The maximum over-coating interval shall not exceed two (2) hours at 25°C (77°F) without roughening the surface. If recoating interval has been exceeded, surface must be blast roughened prior to application of topcoat.
A minimum of four (4) hours curing above 20°C (68°F) is required prior to handling. Handling time maybe longer at lower temperatures.
Apply thoroughly mixed HBE-95 by brush, roller or trowel. When coating pipe, remove application tools on the upstroke to prevent pulling material down and off the pipe bottom.
How to Order
Product Designation
Package Contents
HBE-95-BG Kit-0.5
HBE-95-BG Kit-1.0
HBE-95-BG Kit-1.5
HBE-95-BG Application Kit
375 mL of HBE-95 Base, 125 mL of HBE-95-BG Hardener.
750 mL of HBE-95 Base, 250 mL of HBE-95-BG Hardener.
1125 mL of HBE-95 Base, 375 mL of HBE-95-BG Hardener.
1 pair of rubber gloves, mixing sticks, application scraper.
 


您最近浏览的商品

美国泰亚赛褔